|
|
|
|
Multiple bypasses keep pipeline operational
A pipeline contractor had to replace a leaking section of a 12-inch natural gas pipeline at a road crossing.
HTS furnished fittings and equipment to perform a double 12-inch line stop with a 10-inch bypass. The bypass kept the pipeline operational while the damaged section of the pipe was being replaced. HTS's operation prevented a shutdown of the line, reduced loss of product, and did not require extensive decontamination to perform the work.
Visit HTS for more information.
|
HOME
COMPANY
CASE HISTORIES
MSDS
LOCATIONS
INVESTORS
EMPLOYMENT
EMPLOYEE TRAINING
CONTACT
Team Industrial Services P.O. Box 123 Alvin, TX 77512 1-800-662-8326
|