LEAK REPAIRS
HOT TAPS
FIELD MACHINING
TECHNICAL BOLTING
VALVE REPAIRS
FIELD HEAT TREATING
NDT INSPECTIONS
TURNAROUNDS
CONCRETE REPAIRS
ENERGY MANAGEMENT
EMISSIONS CONTROL
SPECIALTY MAINT.
PIPE REPAIR PRODUCTS
 
 
CUSTOMER SURVEY
 
GOOGLE TRANSLATE
 
© Copyright 2008 Team Industrial Services, Inc. All Rights Reserved. All images, text, graphics and materials are protected by U.S. and International copyright laws.
Webmaster
  

Plug-type enclosure, Team sealants used to repair broken stub-out

A southern plant had a broken ¾" stub-out coming off a 16", 150 psi (475°F) main steam header.

After examining the problem, Team technicians determined that, due to the condition of the broken stub-out, closing on any part of it with an enclosure could result in its breaking completely off.

Team engineers designed a special enclosure to allow the broken pipe to be removed. An adjustable tapered plug that could be tightened into the remaining hole was designed into the enclosure.

The enclosure was installed and the tapered plug was tightened to reduce the blow. The enclosure was then injected and pressured with Team sealant, and the leak was sealed.

Measure-up and installation took slightly over nine hours.

Plant personnel thanked Team technicians for the job.

Visit Enclosure Seals for more information.

HOME COMPANY CASE HISTORIES MSDS LOCATIONS INVESTORS EMPLOYMENT EMPLOYEE TRAINING CONTACT

Team Industrial Services
P.O. Box 123
Alvin, TX 77512
1-800-662-8326