|
|
|
Team's Double Line Stop
- Two SealTite® fittings are welded to the line.
- Temporary valves are installed and two line stop taps completed.
- The two line stops are set and the pressure vented.
- The work between the two line stops is completed.
- The line stops are equalized and removed.
- Team's SealTite® completion plugs are set and the temporary valves removed.
|
|
Team's Double Block and Bleed
- Two SealTite® fittings are welded to the line.
- Temporary valves are installed and two line stops taps completed.
- The two line stops are set and the pressure vented downstream of both line stops.
- The primary line stop holds the pressure while the secondary line stop ensures a 100% safe seal.
- The work downstream is completed.
- The line stops are equalized and removed.
- Team's SealTite® completion plugs are set and the temporary valves removed.
|
|
Team's Double Line Stop With Temporary Bypass
|
HOME
COMPANY
CASE HISTORIES
MSDS
LOCATIONS
INVESTORS
EMPLOYMENT
EMPLOYEE TRAINING
CONTACT
Team Industrial Services P.O. Box 123 Alvin, TX 77512 1-800-662-8326
|