LEAK REPAIRS
HOT TAPS
FIELD MACHINING
TECHNICAL BOLTING
VALVE REPAIRS
FIELD HEAT TREATING
NDT INSPECTIONS
TURNAROUNDS
CONCRETE REPAIRS
ENERGY MANAGEMENT
EMISSIONS CONTROL
SPECIALTY MAINT.
PIPE REPAIR PRODUCTS
 
 
CUSTOMER SURVEY
 
GOOGLE TRANSLATE
 
© Copyright 2008 Team Industrial Services, Inc. All Rights Reserved. All images, text, graphics and materials are protected by U.S. and International copyright laws.
Webmaster
  

Double Line
Team's Double Line Stop
  • Two SealTite® fittings are welded to the line.
  • Temporary valves are installed and two line stop taps completed.
  • The two line stops are set and the pressure vented.
  • The work between the two line stops is completed.
  • The line stops are equalized and removed.
  • Team's SealTite® completion plugs are set and the temporary valves removed.

Double Block and Bleed
Team's Double Block and Bleed
  • Two SealTite® fittings are welded to the line.
  • Temporary valves are installed and two line stops taps completed.
  • The two line stops are set and the pressure vented downstream of both line stops.
  • The primary line stop holds the pressure while the secondary line stop ensures a 100% safe seal.
  • The work downstream is completed.
  • The line stops are equalized and removed.
  • Team's SealTite® completion plugs are set and the temporary valves removed.

Double Line Stop With Temporary Bypass
Team's Double Line Stop With Temporary Bypass

HOME COMPANY CASE HISTORIES MSDS LOCATIONS INVESTORS EMPLOYMENT EMPLOYEE TRAINING CONTACT

Team Industrial Services
P.O. Box 123
Alvin, TX 77512
1-800-662-8326