| Valve Description: Anti Flash Regulator CV |
| Manufacture |
Fisher |
|
| Size |
2" |
|
| Type |
Control Valve |
|
| Pressure |
1500 Lb |
|
| Body Type |
EHS Design |
Cage: linear design/1 1/2 max travel |
| Body Material |
WCB Steel |
|
| Seat Material |
SS/Stellite #21 |
|
| Disc Material |
SS/Stellite #21 |
Disc design: Standard, port size 1-7/8" |
| Actuator |
Pneumatic/ 667 size 70 |
|
| End Connection |
B W (schedule, special) |
|
| Electrical Disconnect Needed |
NA |
In shop repair |
| Insulation Removal Needed |
NA |
In shop repair |
| Scaffolding Needed |
NA |
In shop repair |
| Gasket Size & Style |
Gasket Set Part #12b7100X032 |
|
| Stem: Info. |
3/4" Diameter Shaft |
Material: 316/SS/ 12-TPI x .750" NC |
Arrows Indicate Areas Of The Body Lower Gasket Surface That Was Severely Damaged And Washed Out |
Body Before Weld Build Up And Machining Of Weld Prep |
Body End Connection, After Weld Build Up (Weld Material Used Was 7018) |
Body End Connections After Final Machining Of Weld Prep To Match The Inlet And Outlet Piping, In Addition To The Length Requirement For Reinstallation To System Piping |
Lower Gasket Area, After Weld Build Up |
Body Lower Gasket Surface After Having Been Over-Bored, Welded, Machined And Threaded, To Accept New Internal Components |
The Upper And Lower Gasket Surfaces After Completion Of Final Machining Process |
The Upper And Lower Gasket Surfaces After Completion Of Final Machining Process |
Bonnet Gasket Surface Before Machining |
Bonnet Gasket Surface After Machining |
The First Few Stages In The Manufacturing Process Of The Replacement Cage |
The First Few Stages In The Manufacturing Process Of The Replacement Cage |
As Found Condition Of Original Components |
As Found Condition Of Original Components |
New Cage Ready For Installation |
Disc, Stem And Bonnet As Found |
Disc, Match Machined And Polished To Fit New Cage |
Components And Gaskets Laid Out For Final Inspection And Assembly |
Seat Ring And Cage Installed |
Stem, Disc And Packing Installed |
Final Assembly Of The Valve |
Final Assembly Of The Valve |