Valve Description: Anti Flash Regulator CV

Manufacture Fisher  
Size 2"  
Type Control Valve  
Pressure 1500 Lb  
Body Type EHS Design Cage: linear design/1 1/2 max travel
Body Material WCB Steel  
Seat Material SS/Stellite #21  
Disc Material SS/Stellite #21 Disc design: Standard, port size 1-7/8"
Actuator Pneumatic/ 667 size 70  
End Connection B W (schedule, special)  
Electrical Disconnect Needed NA In shop repair
Insulation Removal Needed NA In shop repair
Scaffolding Needed NA In shop repair
Gasket Size & Style Gasket Set Part #12b7100X032  
Stem: Info. 3/4" Diameter Shaft Material: 316/SS/ 12-TPI x .750" NC


Arrows Indicate Areas Of The Body Lower Gasket Surface That Was Severely Damaged And Washed Out

Body Before Weld Build Up And Machining Of Weld Prep

Body End Connection, After Weld Build Up
(Weld Material Used Was 7018)

Body End Connections After Final Machining Of Weld
Prep To Match The Inlet And Outlet Piping, In Addition To The
Length Requirement For Reinstallation To System Piping

Lower Gasket Area, After Weld Build Up

Body Lower Gasket Surface After Having Been Over-Bored,
Welded, Machined And Threaded, To Accept New Internal Components

The Upper And Lower Gasket Surfaces After
Completion Of Final Machining Process

The Upper And Lower Gasket Surfaces After
Completion Of Final Machining Process

Bonnet Gasket Surface Before Machining

Bonnet Gasket Surface After Machining

The First Few Stages In The Manufacturing
Process Of The Replacement Cage

The First Few Stages In The Manufacturing
Process Of The Replacement Cage

As Found Condition Of Original Components

As Found Condition Of Original Components

New Cage Ready For Installation

Disc, Stem And Bonnet As Found

Disc, Match Machined And Polished To Fit New Cage

Components And Gaskets Laid Out For Final Inspection And Assembly

Seat Ring And Cage Installed

Stem, Disc And Packing Installed

Final Assembly Of The Valve

Final Assembly Of The Valve